Petkim Wind Power Plant, GE Energy Industry Trade and Services Inc. Wind Turbine RMU - Power Transformer Nasal Cable Test and Connection Work (November 2016)
Samsun British-American Tobacco Tobacco Factory Transformer Tests (October 2016)
Yahyalı Wind Power Plant EMA Elektrik Makine Araştırma A.Ş. 154 kV Substation High Voltage Tests (September 2016)
Usak 380 kV TEİAŞ Substation; GE Grid Solutions Endüstri Enerji A.Ş. 380 kV 250 MVA Power Transformer High Voltage Commissoining Tests (September 2016)
Mare Wind Power Plant, ABB Elektrik Sanayi A.Ş. 154 kV Transformer Feeder Tests, 2 Line Feeder Circuit Breaker Test and Commissoning Works (September 2016)
Kırkağaç Wind Power Plant EMA Elektrik Makine Araştırma A.Ş. 154 kV Substation High Voltage Commissoining Tests Tests (August 2016)
Poyraz Wind Energy Power Plant 154 kV Substation Test & Commissioning (April 2016)
Soma Wind Energy Power Plant 34,5 kV Feeder Test & Commissioning (November 2015)
Poyrazgölü WEPP 154 kV Transformer Station Test & Commissioning (October 2015): Primary (including grounding measurement) and secondary all test and commissioning for transformer station was performed by our company. MV cable test between wind energy converters and grounding measurement of WECs were also done by our company.
Kargı (Statkraft) Hydroelectric Power Plant Transformer Station (February 2014): Primary (including grounding measurement) and secondary all test and commissioning for transformer station was performed by our company.
Geycek Wind Energy Power Plant (150 MW)154 kV Transformer Station (September 2013): Primary (including grounding measurement) and secondary all test and commissioning for transformer station was performed by our company. MV cable test between wind energy converters and grounding measurement of WECs were also done by our company.
380 kV Göynük Thermal Power Plant: Primary and secondary all test and commissioning for transformer station was performed by our company.
MV, HV Cable Test References
Seyitali Rüzgar Enerji Santrali Extension Projesi AC VLF Hi-pot Cable Tests |
11.2016 |
Anemon İntepe WEPP (Demirer Holding) |
05.2016 |
Bandırma WEPP (Borusan) |
08.2015 |
High Speed Train Switchgear (Eskişehir) |
08.2015 |
İçdaş WEPP 36 kV Underground Cable (İÇDAŞ A.Ş) |
08.2015 |
Harmanlık WEPP( Borusan ENBW ) |
07.2015 |
Anadolu Cam Sanayi Eskişehir A.Ş. (28 Unit Feeder Tests) |
06.2015 |
Koru WEPP (Borusan ENBW ) |
04.2015 |
Anemon WEPP (Demirer Holding) |
01.2014 |
Lodos Karaburun WEPP (Alto Holding), |
08.2013 |
We performed cable tests by using DC Hi-pot equipment until now. This test is in the scope of destructive test class. If there is a failure on the cable, this test dislocates the faulty point, fault is detected and this fault can be solved before commissioning. But, AC Hi-pot is more preferred option according to literature. Destructive level is lower compared with DC Hi-pot. So, we added B2 HVA 60 type AC Hi-pot device to our equipment list. We can both perform DC and AC Hi-pot test according to request of customer.
Grounding Measurement
We performed grounding measurement for wind energy converters by using Selvaz method.
Bosen Enerji Elektrik Üretim A.Ş. |
11.2016 |
Kargı HES ( Dinamik Hidroelektrik Santr. Enerji Yatırımları A.Ş.) |
10.2016 |
Alaşehir JES ( Türkerler Holding ) |
10.2016 |
Mare RES ( Tanınmış İnşaat) |
08.2016 |
Haymeana HES (Polatyol Yapı Sanayi Ticaret A.Ş.) |
05.2016 |
İntepe RES( Tanınmış İnşaat Türbin Temeli ) |
05.2016 |
İntepe WEPP (WEC Foundation in the scope of Tanınmış İnşaat company) |
05.2016 |
Poyraz WEPP (NM Enerji Elektrik Üretim A.Ş.) |
12.2015 |
Sares WEPP(Gama Enerji) |
12.2015 |
Çilehane HEPP (NKD Elektrik Üretim A.Ş.) |
10.2015 |
Havva HEPP (Erzurum İklimya Elektrik Üretim A.Ş.) |
10.2015 |
Buski D0 HEPP |
06.2015 |
Poyrazgölü WEPP (Ufuk Enerji Elektrik Üretim A.Ş. ) |
07.2015 |
Ada WEPP (Esit Enerji A.Ş.) |
10.2015 |
Keltepe WEPP (Alize Enerji Elektrik Üretim A.Ş.) |
08.2015 |
Kavaklı WEPP (Briza Rüzgar Elektrik Üretim A.Ş.- Erciyas Holding) |
05.2015 |
Edincik WEPP (Edincik Enerji Üretim A.Ş.) |
06.2015 |
Kuyucak WEPP (Alize Enerji Elektrik Üretim A.Ş.) |
06.2015 |
Cogen Plant (Demirer Kablo Tesisleri San Tic. A.Ş. ) |
02.2015 |
Soma WEPP (Soma Enerji Elektrik Üretim A.Ş.) |
11.2014 |
Umurlar WEPP |
09.2014 |
Samurlu WEPP (Elfa Elektrik Üretim A.Ş.) |
09.2014 |
Seyitali WEPP (Doruk Enerji Elektrik Üretim A.Ş.) |
07.2014 |
Kozbeyli WEPP (Doğal Enerji Elektrik Üretim A.Ş. ) |
12.2014 |
Poyraz WEPP (Poyraz Enerji Elektrik Üretim A.Ş. ) |
02.2014 |
380 kV Circuit Breaker Installation & Tests
MAINTENANCE ACTIVITIES
Doğal Enerji Elektrik Üretim A.Ş., Burgaz WEPP 154 kV Transformer Station Maintenance (October 2014)
All electrical and mechanical test and maintenance requirement was performed for transformer station. Necessary actions were performed under corrective maintenance scope. Relay sets were checked for all protection devices and necessary corrective actions were done.
Doğal Enerji Elektrik Üretim A.Ş., Sayalar WEPP 154 kV Transformer Station Maintenance (November 2014)
All electrical and mechanical test and maintenance requirement was performed for transformer station. Necessary actions were performed under corrective maintenance scope. Relay sets were checked for all protection devices and necessary corrective actions were done.
Alize Enerji Elektrik Üretim A.Ş., Keltepe WEPP 34,5 kV Transformer Station Maintenance (December 2014)
Mechanical controls for metal clad cubicles in the transformer station were done. Insulation tests were performed. Relay set parameters were checked and tested.
Tel : (224) 451 64 52
Fax : (224) 451 54 52
Odunluk Mah. Akpınar Cd. No:13/B
Uludağ (Zorlu) Plaza B Blok Kat:7 Ofis:35
Nilüfer / BURSA